Commit

 

Commit
Persistent
Calculation

The Commit Persistent Calculations command, tells PowerOLAP® to remove the marker on each data point that was generated by a persistent calculation and treat it as if it was a point entered to PowerOLAP®.

 

To Commit Persistent Calculations:

1.   In the PowerOLAP ribbon, go to Data tab then in the Persistent Calculations control group, select Commit command.
The Generate Persistent Calculations dialog box appears.

2.   Choose whether to generate persistent calc formulas for All or only Selected cubes by enabling the appropriate radio button. If the Selected radio button is enabled, you must pick the specific cube/s by clicking on the corresponding checkbox.

3.   Click OK.